***  August 29, 2000 ***

updated 7pm

Well, not a lot done physically that can be seen.  

Rich had a chat with the builder, the electrician and the HVAC guys today during lunch at the house.  They marked up things on the wall studs like where we want plugs, vents, etc. along with discussing the plans for our running of the cables.  Hopefully, this weekend, we'll be out there getting those cables run and out of the dining room floor of the apt.  

Ann went to the parts place and racked up a pretty good quote on the jacuzzi tub, the faucets, sinks, toilets, and hot water heater.  Can we say, we like Kohler?  :-)  Here's the sink for the master bath (2) and the powder room.  Next to it is a pic of the bathroom faucets.  This will be it or there's also a Moen version that I like that is VERY similiar.  The jacuzzi faucet would be similiar style handles.

 


Arrival of outside finishing stuff means more work to be done soon there...

Another view of the new arrivals and Rich is inspecting the pocket door frames.  We have 2 pocket doors- one between the kitchen and dining room and the second is in the master bath that separates the "toilet room" from the rest of the bathroom.

Evidence of Rich's and the electrician's conversations... "P"'s on studs indicating plug locations and you can kind of see the "UC" for the undercabinet lighting location.