*** November 18 & 19, 2000 ***
updated: 11/19 4pm
Yes, there was work done this weekend - YAH! The electrician was out both Saturday and Sunday working on more plugs, switches, and hanging more lights.
Rich went out both days as well and got to working on doing the volume controls for the speakers and getting the phone/network/cable jacks punched. The count so far is 2 volume controls (which are a LOT tougher to do than you would think) and about 6 of the others which are combo phone/network/cable jacks.
Not a lot of pics today - I only went out yesterday to watch the volume controls and didn't go at all today as I'm fighting off a cold. :-(
Here's volume control #1.... after the second one got installed, there's 7 more to go (yes, there are 8 sets of speakers inside but we've wired for speakers on the back patio too).
This is the mess that the electrician made with all the lights, switches, and plugs. But this is a good mess.
And, I ran across the street since it was daylight and got a shot of the front of the house so you can see the columns. They still need to be painted. If the weather holds we may see sod this week. HA. ;-)