***  November 22, 2000 ***

updated 5:45pm

   I feel better now... they had to have traffic cops out there directing the traffic at the house... ;-)

The tile guy was back and boy, did he lay some tile?!  Then, the plumber was out and got 2 toilets, 1 sink and faucet installed, 1 sink and faucet ready to go and did prep work on the others.  THEN, the electrician was back and just about finished up...little things are left to do on his side.  AND, Rich spent the afternoon out there working on his plugs and volume controls.  So, by the time I got there at 4:30 with the camera there was plenty to see.  :-)

On the front porch, the electrician added 2 recessed lights... these are a freebie because the electrician goofed originally and forgot to move the other lights out some so we get 2 lights out of it... :-)

This is our cool pattern in the kitchen...

The kitchen sink and faucet are in...

The 2 recessed lights over the sink and dishwasher got put in today too.

The same tile pattern was repeated in the breakfast area.

He got most of the tile in the kitchen and down the hall done.

This is the light on the back patio now that they've figured out that it wasn't supposed to be a ceiling fan that they couldn't find...hehe...

A look out at the back yard... kinda flat. 

This is a multiple pic - you can see the laundry sink and faucet that's ready to go when he can get into the laundry room.  Then, on the wall, left to right there is a speaker plug, cable jack, and the network/phone jack.

Toilet #1 in the hall bath!

Toilet #2 in the master bath!  #3 is sitting in the garage waiting for tile to go into the powder room...

The lights over the master bath vanity...

The water heater arrived today!

One of the 3 lights in the ceiling of the garage.

Lights on the outside of the garage.

Another light!

This also has multiple foci (?) - the electrician got the meter up along with flood lights on both of the corners here.  You can see the one above the meter but it's hard to see the other one on the far end.

 

And, we have heard that these guys may be working some tomorrow and maybe some on Friday or Saturday so hopefully we'll see more progress now that we're at about the 3 week mark...  :-)